Email: info@excelstartech.com

  • Make a call:0557374006
  • Po Box 121731, Dubai, UAE

Our Services

Services

Garbage Chute Company in Dubai

CHUTE OVER VIEW

Garbage Chute Company in Dubai 

XL Star Technical Services is the Leading Company in Garbage Chute in Dubai. We have team of professional who can give services for all types of garbage Chute Cleaning and Repairing Services in Dubai United Arab Emirates

In this section, standard descriptions of our product range are given, however tailor-made solutions are designed as per the project basis. The product range is divided as follows:

2.1 Refuse and Linen Chutes

2.2 Chute System and Supports

2.3 Intake doors and locking system

2.4 Vent Chute

2.5 Fire Fighting System

  • Firefighting glass bulb sprinklers
  • Fire shutter door
  • Fire Guard

2.6 Auto-cleaning system

  • Control Panel
  • Top Section Access Door
  • Sanitizer Pumping Kit
  • Auto Flushing.
Intake doors

Garbage Chute Company in Dubai 

Standard Chute Specifications

3.1 Refuse and Linen Chutes

3.2 Chute system and Supports

  • Chute system produced are generally fabricated of Grade 304 Stainless Steel, however this parameter can be modified as required by specifications or other project constraints. Chute shall be fully factory assembled with all joints welded. All chutes shall be flush interior without any rivet, bolts or clips protruding into the chute opening.
  • If not explicitly noted in specifications, Excel can design optimal chute diameters based on the principles of Value Engineering and to comply with NFPA 82, ensuring that the most economical solution is always presented to our clients. The standard diameters of the chutes are available in 60cm, 70 cm, and 80cm and up to 90cm diameter. The standard chute size is 60cm as per NFPA recommendation.
  • Chute thickness design is based on in compliance with NFPA code. However, extra strengthening is always required at the offset elbow in the ground floor garbage room based on the value engineering.
  • Chute supports are fabricated of 50X50X5mm angles. Supports are either cold galvanized or hot dipped galvanize, as required by the specifications.
  • All chutes are painted in a pre-approved sound damp membrane. In some instances, should specification necessitate.

3.1.2 Intake doors

Garbage Chute Company in Dubai 

  • Our intake doors are fully fabricated from stainless steel and use the highest quality accessories.
  • The doors are 100% stainless steel bottom hinged, to open noiseless, self-sealing and self-closing. The design of the door opening will ensure that there is no blockage of the chute due to the falling refuse.
  • Our doors can be 2.0 hour fire rated if required by the customer and have the ability to pass some of the world’s most stringent testing requirements.
  • Electro-mechanical locks are installed on every door; the locks assure that the chute doors are fully locked during cleaning and maintenance of the chute.
  • Our unique additional FIRE GUARD system links the firefighting system to the locking Mechanism, ensuring all doors is locked, should a fire occur in the chute. This system is optional only if required by customer. Our doors are standard with single light (Red) to ensure about the Safety of chute use if required by customer double lights (Red- Green) can provided. Our unique ADDLITE system uses three lights (amber) to identify the impending commencement of chute Closure (in case of using the AUTO-CLEAN system).

3.1.3 CHUTE VENT

Garbage Chute Company in Dubai 

Vent shall be made to the reduce diameter. The standard vent chute diameter meter is from 25cm to 35cm. The vent chute is extended 3 feet above the finished roof as per NFPA recommendation. Vent chute material and thickness shall be same specification as of chute system. Vent shall be completed with roof flushing to insure a watertight seal and shall provide with a bird mesh to prevent from fly and insect and draft mesh to prevent updraft. The exhaust fan is provided on top of the vent chute to have min 15 to 20 air changes.

Deep Chute Cleaning

Garbage Chute Company in Dubai 

It is important to clean your disposal system on a regular basis to minimize odors and help reduce the risks of rodent problems. It also helps prevent high maintenance and repair costs to the garbage disposal equipment.

By cleaning the disposal system on a regular basis, you can provide your staff and residents with a clean and safe environment to live in.

EMERGENCY SERVICE :

When you need a Reliable, and Knowledgeable technician to solve your Chute or Bin problem FAST, Give us a call. Excel Star , is available for you 24/7 for any emergency service work…just call us and someone will respond ASAP!

We can fix, repair, and maintain any type of recycling chutes, linen chutes, garbage, or trash chutes, and we do it efficiently and effectively while always complying with NFPA 82.

Our mechanics will get you up and running in no time – minimizing your downtime, limiting trash build- up, and keeping your tenants happy.

3.1.5 Auto-cleaning system

Specifications of the Automatic cleaning system for excellent standard Refuse chute.

  • Control Panel: Located in chute discharge room. Press button to start operations. The panel requires a single-phase power supply with a single Isolator. Naturally, the control panel varies in complexity when adding on extra features to the basic design.
  • Top Section Access Door: Housed above the intake hopper on the top serviced level. This will feature a lockable door that will give access for refilling of sanitizer unit and fan and servicing the same.
  • Sanitizer Unit: Unit is located in the top section of chute. This sanitizing unit is used in conjunction with the flushing spray head located at the top intake level. When the auto flushing is activated, a measure of sanitizer is pumped into a mixing chamber in the flush outlet pipe. The measure is carried out by the preset timer provided in the control panel. The sanitizing unit clean and deodorizes the chute riser when used on a regular cleaning.
  • Auto Flushing: The system is activated by using electrically operated solenoid valve, which is connected through control panel. The water is quickly ‘flushed’ through the outlet pipe into the potable water line connected to the sprinklers on either each or alternate floors.
  • Water Pump 1.5 HP Water Pump is provided at the top of the Chute Italian Make Booster Water Pump Located at the top of roof floor to discharge water for cleaning Purpose.